{"id":3958,"date":"2023-07-07T11:34:14","date_gmt":"2023-07-07T09:34:14","guid":{"rendered":"https:\/\/cigip.webs.upv.es\/?p=3958"},"modified":"2024-02-28T11:13:57","modified_gmt":"2024-02-28T10:13:57","slug":"negosol-mas-en","status":"publish","type":"post","link":"https:\/\/cigip.webs.upv.es\/en\/negosol-mas-en\/","title":{"rendered":"I. Models and methods with negotiated procedures based on software agents for the production scheduling in hybrid flow workshops subject to uncertainty in mixed MTS-MTO environments and their design methodology (NEGOSOL-MAS)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"3958\" class=\"elementor elementor-3958\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6e1baed9 e-con-full e-flex e-con e-parent\" data-id=\"6e1baed9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0036835 e-flex e-con-boxed e-con e-parent\" data-id=\"0036835\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eec4b64 elementor-widget elementor-widget-heading\" data-id=\"eec4b64\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">UPV R&amp;D Projects - year 2010<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bc74554 e-flex e-con-boxed e-con e-parent\" data-id=\"bc74554\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a08af5d elementor-widget elementor-widget-heading\" data-id=\"a08af5d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Models and methods with negotiated procedures based on sotfware agents for the production scheduling in hybrid flow workshops subjects to uncertainty in mixed MTS-MTO environments and their design methodology (NEGOSOL-MAS)<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-58b0279 e-flex e-con-boxed e-con e-parent\" data-id=\"58b0279\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c710ef5 elementor-widget elementor-widget-text-editor\" data-id=\"c710ef5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"ficha1proy\"><p><span class=\"textoRojo\">Reference:\u00a0<\/span>PAID-06-10-2396<br \/><span class=\"textoRojo\">Period underway:\u00a0<\/span>01\/11\/2010 &#8211; 01\/11\/2012<br \/><span class=\"textoRojo\">Type:\u00a0<\/span>Competitive research projects<br \/><span class=\"textoRojo\">Amount:\u00a0<\/span>15,000 \u20ac<br \/><span class=\"textoRojo\">Financed by:\u00a0<\/span>Universitat Polit\u00e8cnica de Val\u00e8ncia<br \/><span class=\"textoRojo\">Principal Investigator:\u00a0<\/span>G\u00f3mez Gasquet, Pedro<br \/><span class=\"textoRojo\">Participant:\u00a0<\/span>G\u00f3mez-Gasquet, Pedro; Lario Esteban, Francisco Cruz; Ortiz Bas, \u00c1ngel; Franco Pereyra, Rub\u00e9n Dar\u00edo; Segura Andr\u00e9s, Rub\u00e9n<\/p><\/div><div class=\"ficha2proy\"><p><span class=\"textoRojo\">Description:<\/span><\/p><p>Within a global competition framework, in which response times become increasingly relevant as a competitive element, there are many challenges that organisations have to faced. Among these, operations management, and particularly production planning, can help to improve the flexibility and robustness of production systems to a great extent.<\/p><p>Although Production Scheduling has been traditionally considered quite a quantitative viewpoint, this project aims to adopt an approach that comes closer to decision-making support systems. It is proposed that the operational decisions to be made in the production scheduler&#8217;s area are connected, and that a consensus is reached in this case with their decisional environment (planning, orders management, warehouses and workers) based on the restrictions that each one proposes.<\/p><p>This project puts forward three objectives: defining a methodology; developing models associated with new issues; designing algorithms to search for solutions.<\/p><p><span class=\"textoRojo\">The methodology<\/span>\u00a0intends to formally determine the path that must be followed to model a production scheduling problem within a hybrid flow workshop frame, such as negotiation process management, which poses using software agents to represent the different roles of the production system involved and to the search for a solution.\u00a0<span class=\"textoRojo\">The models<\/span>\u00a0will be proposals of the negotiation processes that will represent different configurations of the problem under study. Special emphasis will be placed on analysing the variants related to the production approach, which combines the &#8220;make-to-stock&#8221; and &#8220;make-to-order&#8221; in the same system, and is being adopted by some companies as a way to move forward to mass customisation. Algorithms will be used as a tool as part of the process that has been previously modelled, and should be able to be easily integrated into the designed process, or the algorithms themselves should be able to configure a negotiation process that follows the defined methodology.<\/p><p>This project objective is to cut the existing distance between available proposals and production companies\u2019 requirements with the indicated features. The inclusion of quantitative negotiation procedures enables real situations to be dealt with and the solutions can adapt to requirements at all times that will, in turn, improve the performance and flexibility of production systems.<\/p><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-77e3dce elementor-widget elementor-widget-image\" data-id=\"77e3dce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/cigip.webs.upv.es\/wp-content\/uploads\/elementor\/thumbs\/Copia-de-upv_grey-e1741859680786-r2slv1zwy08ab4y3wll8oomjoetp642aekzofea56q.png\" title=\"Copia-de-upv_grey\" alt=\"Copia-de-upv_grey\" loading=\"lazy\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-c64c791 e-flex e-con-boxed e-con e-parent\" data-id=\"c64c791\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9cf492f elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"9cf492f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>UPV R&amp;D Projects &#8211; year 2010 Models and methods with negotiated procedures based on sotfware agents for the production scheduling in hybrid flow workshops subjects to uncertainty in mixed MTS-MTO environments and their design methodology (NEGOSOL-MAS) Reference:\u00a0PAID-06-10-2396Period underway:\u00a001\/11\/2010 &#8211; 01\/11\/2012Type:\u00a0Competitive research projectsAmount:\u00a015,000 \u20acFinanced by:\u00a0Universitat Polit\u00e8cnica de Val\u00e8nciaPrincipal Investigator:\u00a0G\u00f3mez Gasquet, PedroParticipant:\u00a0G\u00f3mez-Gasquet, Pedro; Lario Esteban, Francisco Cruz; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","footnotes":""},"categories":[489,309,495,719],"tags":[],"class_list":["post-3958","post","type-post","status-publish","format-standard","hentry","category-r-d-projects","category-research","category-upv-projects","category-upv-projects-2010"],"_links":{"self":[{"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/posts\/3958","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/comments?post=3958"}],"version-history":[{"count":0,"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/posts\/3958\/revisions"}],"wp:attachment":[{"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/media?parent=3958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/categories?post=3958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cigip.webs.upv.es\/en\/wp-json\/wp\/v2\/tags?post=3958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}